Gate Operator Replacement Parts
-
Nice Apollo 416 ActuatorGD# APL-416-1 MFR# 416-1• Nice Apollo 1500 Single or 1600 Master Actuator with 8' cord
• No soft stop
• 5-7 Business Day Lead Time See More Details$1,470.00 -
Nice Apollo 512-2 Actuator Arm - 42' CableGD# APL-512-2 MFR# 512-2• Actuator Arm with 42' Cable
• 5-7 Business Day Lead Time See More Details$831.00 -
Nice Apollo 816-1 Actuator Kit - 8' CableGD# APL-816-1 MFR# 816-1• 816 Actuator with speed sensor & 8 ft harness
• Includes mounting hardware
• 5-7 Business Day Lead Time See More Details$1,096.00 -
Nice Apollo 816-2 Actuator Kit - 42' CableGD# APL-816-2 MFR# 816-2• 816 Actuator with speed sensor & 42 ft harness
• Includes mounting hardware
• Add to 1551 for dual gate applications
• 5-7 Business Day Lead Time See More Details$1,187.00 -
Nice Apollo 912L-1 Actuator Kit - 12' CableGD# APL-912l-1 MFR# 912L-1• 912L actuator, 12V with encoder, 12 ft harness
• Includes mounting hardware
• 5-7 Business Day Lead Time See More Details$1,012.00 -
Nice Apollo 912L-2 Actuator Kit - 42' CableGD# APL-912l-2 MFR# 912L-2• 912L actuator, 12V with encoder, 42 ft harness
• Includes mounting hardware
• Add to TITAN12L or TITAN12L1 for dual gate applications
• 5-7 Business Day Lead Time See More Details$1,084.00 -
Nice Apollo T7X1K ActuatorGD# APL-t7x1k MFR# T7X1K• Nice Apollo NT-T71K Actuator with 8' or 38' cord
• Includes Pivot Arm and Hardware
• 5-7 Business Day Lead Time See More Details$1,198.00 -
DoorKing 6050-381 Swing Gate Operator - SecondaryGD# DKS-6050-381 MFR# 6050-381• Secondary Operator w/30' Cable
• All Products Require a 3-5 Day Lead Time See More Details$1,578.00 -
DoorKing 6100-381 Secondary Swing Gate OperatorGD# DKS-6100-381 MFR# 6100-381• Secondary Operator w/ 40' Cable
• All Products Require a 3-5 Day Lead Time See More Details$1,584.00 -
DoorKing 6300-381 Secondary Swing Gate Operator - 1/2 HPGD# DKS-6300-381 MFR# 6300-381• Secondary Operator w/ 50' of Cable
• All Products Require a 3-5 Day Lead Time See More Details$1,969.00 -
DoorKing 6300-385 Secondary Swing Gate Operator - 1 HPGD# DKS-6300-385 MFR# 6300-385• Secondary Operator w/ 50' of Cable
• All Products Require a 3-5 Day Lead Time See More Details$2,388.00 -
DoorKing 6500-381 Secondary Swing Gate Operator - 1/2 HPGD# DKS-6500-381 MFR# 6500-381• Secondary Operator w/ 50' of Cable
• All Products Require a 3-5 Day Lead Time See More Details$2,640.00 -
DoorKing 6500-385 Secondary Swing Gate Operator - 1 HPGD# DKS-6500-385 MFR# 6500-385• Secondary Operator w/ 50' of Cable
• All Products Require a 3-5 Day Lead Time See More Details$2,981.00 -
DoorKing 6550-384 1 HP Secondary Swing Gate OperatorGD# DKS-6550-384 MFR# 6550-384• Secondary Operator w/ 50' of Cable
• All Products Require a 3-5 Day Lead Time See More Details$4,670.00 -
DoorKing 9000-381 Secondary Slide Gate Operator - 1/2 HPGD# DKS-9000-381 MFR# 9000-381• Secondary Operator - 1/2 HP
• All Products Require a 3-5 Day Lead Time See More Details$2,036.00 -
DoorKing 9000-386 Secondary Slide Gate Operator - 1 HPGD# DKS-9000-386 MFR# 9000-386• Secondary Operator - 1 HP
• All Products Require a 3-5 Day Lead Time See More Details$2,388.00 -
FAAC 10675315 770 Secondary OperatorGD# FAC-10675315 MFR# 10675315• Use for Slave Arm or Replacement Arm
• No support box (490065)
• All Products Require a 3-5 Day Lead Time See More Details$760.00 -
FAAC 104579 390 Operator Only - ReplacementGD# FAC-104579 MFR# 104579• Replacement Arm
• For Dual Gates Order #104579.5
• All Products Require a 3-5 Day Lead Time See More Details$871.00 -
FAAC 104579.5 390 Secondary Operator w/2 Limit SwitchesGD# FAC-104579.5 MFR# 104579.5• For Dual Gates
• All Products Require a 3-5 Day Lead Time See More Details$787.00 -
FAAC 738705 Articulated Arm Replacement - StandardGD# FAC-738705 MFR# 738705• Articulated Arm replacment 390 Operator
• All Products Require a 3-5 Day Lead Time See More Details$329.00 -
FAAC 1042011 400 CBAC Secondary Operator - Standard / 230VACGD# FAC-1042011 MFR# 1042011• 230V
• Hydraulic locking open & closed
• Normal swing speed
• Make the single kit into a master/slave, or to order replacement operator
• All Products Require a 3-5 Day Lead Time See More Details$1,367.00 -
FAAC 104201125 400 CBAC Secondary Operator - Standard / 115VACGD# FAC-104201125 MFR# 104201125• 115V
• Hydraulic locking open & closed
• Normal swing speed
• Make the single kit into a master/slave, or to order replacement operator
• All Products Require a 3-5 Day Lead Time See More Details$1,367.00 -
FAAC 1042011577 400 CBAC Secondary Operator - Standard / 115VAC w/Arctic OilGD# FAC-1042011577 MFR# 1042011577• 115V w/Arctic Oil
• Hydraulic locking open & closed
• Normal swing speed
• Make the single kit into a master/slave, or to order replacement operator
• All Products Require a 3-5 Day Lead Time See More Details$1,654.00 -
FAAC 1042011677 400 CBAC Secondary Operator - Standard / 230VAC w/Arctic OilGD# FAC-1042011677 MFR# 1042011677• 230V w/Arctic Oil
• Hydraulic locking open & closed
• Normal swing speed
• Make the single kit into a master/slave, or to order replacement operator
• All Products Require a 3-5 Day Lead Time See More Details$1,654.00 -
FAAC 1042021 400 CBAC-EG Secondary Operator - Extended / 230VACGD# FAC-1042021 MFR# 1042021• 230V
• Normal swing speed
• Extended Geometry (longer arm)
• Make the single kit into a master/slave, or to order replacement operator
• All Products Require a 3-5 Day Lead Time See More Details$1,551.00