Bollard Accessories
-
FAAC JPF275 116120 Fixed Bollard Mounting FrameGD# FAC-116120 MFR# 116120• Fixed Bollard Mounting Frame
• For J275/600F and J275/800F Traffic Bollards
• All Products Require an 8-12 Week Lead Time See More Details$380.00 -
FAAC JH275 116200 Bollard Pit HeaterGD# FAC-116200 MFR# 116200• Bollard Pit Heater
• To extend operation down to -13° F (-25° C)
• For J275/600 HA and J275/800 HA Traffic Bollards
• All Products Require an 8-12 Week Lead Time See More Details$688.00 -
FAAC JC275 116201 Bollard Pit CoverGD# FAC-116201 MFR# 116201• Bollard Pit Cover
• For J275/600 HA and J275/800 HA Traffic Bollards
• All Products Require an 8-12 Week Lead Time See More Details$350.00 -
FAAC 116501 Bollard Pit HeaterGD# FAC-116501 MFR# 116501• Bollard Pit Heater
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$631.00 -
FAAC 116502 Release Kit w/ Pressure SwitchGD# FAC-116502 MFR# 116502• Solenoid Valve & Pressure Switch
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$624.00 -
FAAC 116503 Acoustic BuzzerGD# FAC-116503 MFR# 116503• Acoustic Buzzer
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$96.00 -
FAAC 116504 LED Light KitGD# FAC-116504 MFR# 116504• LED Light Kit
• For J200HA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$218.00 -
FAAC 390084 Bollard Release KeyGD# FAC-390084 MFR# 390084• Bollard Release Key
• Includes 5 Keyes
• For J200SA & J275SA Bollards
• All Products Require an 8-12 Week Lead Time See More Details$131.00 -
FAAC 1161001 Pit - J275/600 BollardGD# FAC-1161001 MFR# 1161001• Installation Pit
• Use with 1161011 for J275/800 Bollard
• All Products Require an 8-12 Week Lead Time See More Details$1,065.00 -
FAAC 1161011 Pit Extension - J275/800 BollardGD# FAC-1161011 MFR# 1161011• Installation Pit Extension
• Use with 1161001 for J275/800 Bollard
• All Products Require an 8-12 Week Lead Time See More Details$249.00 -
FAAC J275HA 2K 116210 Pressure SwitchGD# FAC-116210 MFR# 116210• Pressure Switch
• All Products Require an 8-12 Week Lead Time See More Details$166.00 -
FAAC JS R/JS F 117904 Base CoverGD# FAC-117904 MFR# 117904• Base Cover
• All Products Require an 8-12 Week Lead Time See More Details$258.00 -
FAAC J275HA 2K 116211 Solenoid Valve UnitGD# FAC-116211 MFR# 116211• Solenoid Valve Unit
• All Products Require an 8-12 Week Lead Time See More Details$417.00 -
FAAC JE275 117300 Bollard Control UnitGD# FAC-117300 MFR# 117300• JE275 Bollard Control Unit
• Controls up to 3 bollards
• For J200HA
• All Products Require an 8-12 Week Lead Time See More Details$601.00 -
FAAC JS HA 117906 Bollard Pit HeaterGD# FAC-117906 MFR# 117906• Bollard Pit Heater
• All Products Require an 8-12 Week Lead Time See More Details$710.00 -
FAAC JS 117903 Bollard Pit CoverGD# FAC-117903 MFR# 117903• Bollard Pit Cover
• All Products Require an 8-12 Week Lead Time See More Details$1,065.00 -
FAAC JS HA 117905 Emergency Manual PumpGD# FAC-117905 MFR# 117905• Emergency Manual Pump
• All Products Require an 8-12 Week Lead Time See More Details$1,281.00 -
FAAC J275 2K20 116140 Bollard Installation PitGD# FAC-116140 MFR# 116140• Bollard Installation Pit
• All Products Require an 8-12 Week Lead Time See More Details$1,668.00 -
FAAC JS R/JS F 117902 Underground Bollard BaseGD# FAC-117902 MFR# 117902• Underground Bollard Base
• All Products Require an 8-12 Week Lead Time See More Details$3,269.00 -
FAAC JS HA 117901 Bollard PitGD# FAC-117901 MFR# 117901• Bollard Pit
• All Products Require an 8-12 Week Lead Time See More Details$5,228.00